Garage Installation and Delivery Made Simple
Our garages are delivered on a tilt trailer and if needed, are put in place by mule to ensure exact placement. Delivery is scheduled direct from the factory. Our goal is to work with your schedule and to give you a pleasant experience from start to finish.
Note: On site construction is available to accommodate building sites with limited access.
SITE PREPARATION
Please ensure that our “garage mule” can bring the garage fully assembled into your backyard.

Garage Installation METHOD #1
Our service continues once you leave the lot. We take care of you by offering site preparation. By choosing gravel for your site garage, you can be sure that your garage will stand the test of time without having to be repositioned every few years.

Garage Installation Method #2
Spread 3″ to 4″ of #57 limestone, 12″ wider than the building size on all four sides. Limestone can be put directly on top of the grass or you may want to remove 3″ to 4″ of sod then replace with your stone. We advise not to put down plastic as it may trap water underneath the building floor. However, you may use a landscaping material that will allow the water through and still prevent weed from growing. This is the best method of site preparation to use if the ground is fairly level.

Garage Installation METHOD #3
A concrete pad can also be poured. If you plan to eliminate the wood floor and use the concrete as the floor, the pad size needs to be exactly the size of the building and 6″ above ground level (pad must not be oversized). The siding will then lip down over the edge of the concrete by one inch. Do not attach any kind of bolts or anchors. We will anchor the building directly to the concrete using concrete anchors drilled into the pad. If you decide to pour a concrete ramp, it is very important to drop down 1-1.5″ or 2″ from the top of the pad since the door will also lip down over the concrete by one inch. Call for exact door location.
Wide Variety in Flexibility For Your Financing
Questions? Call Us Today
330-877-8898 (Hartville) 330-239-2200 (Medina). Or Email Dave at dave.kidsworld@gmail.com
Keep Up With Our Blog
How To Organize A Storage Shed Like A Pro
Estimated reading time: 8 minutes Setting up a storage shed might pose some challenges since you're working with space and a mix of tools and equipment to store inside it. You might be wondering about how to organize a storage shed like a pro. If you tackle it...
Huge Storage Buildings
Estimated reading time: 5 minutes Large storage facilities provide a solution, for storage requirements by offering great flexibility and plenty of space for tools, cars,l business stockpiles and other items. They are built to last in weather conditions and frequent...
How Much Weight Can A Shed Floor Hold
Estimated reading time: 7 minutes Before arranging your shed to store items, like tools and heavy equipment inside it is important to know the weight capacity of the floor in order to avoid any damage to its structure and ensure safety measures are in place This guide...
Get Your Garage Installed Today
330-877-8898 (Hartville) 330-239-2200 (Medina). Or Email Dave at dave.kidsworld@gmail.com