500 PLUS FACTORY-DIRECT STORAGE SHEDS AND BARNS READY FOR IMMEDIATE DELIVERY 60 MONTHS, 0% INTEREST FINANCING AVAILABLE

Garage Installation and Delivery Made Simple

Our garages are delivered on a tilt trailer and if needed, are put in place by mule to ensure exact placement. Delivery is scheduled direct from the factory. Our goal is to work with your schedule and to give you a pleasant experience from start to finish.

Note: On site construction is available to accommodate building sites with limited access.

SITE PREPARATION

Please ensure that our “garage mule” can bring the garage fully assembled into your backyard.

shed installation services 1

Garage Installation METHOD #1

Our service continues once you leave the lot. We take care of you by offering site preparation. By choosing gravel for your site garage, you can be sure that your garage will stand the test of time without having to be repositioned every few years.

shed installation

Garage Installation Method #2

Spread 3″ to 4″ of #57 limestone, 12″ wider than the building size on all four sides. Limestone can be put directly on top of the grass or you may want to remove 3″ to 4″ of sod then replace with your stone. We advise not to put down plastic as it may trap water underneath the building floor. However, you may use a landscaping material that will allow the water through and still prevent weed from growing. This is the best method of site preparation to use if the ground is fairly level.

shed installation services near me

Garage Installation METHOD #3

A concrete pad can also be poured. If you plan to eliminate the wood floor and use the concrete as the floor, the pad size needs to be exactly the size of the building and 6″ above ground level (pad must not be oversized). The siding will then lip down over the edge of the concrete by one inch. Do not attach any kind of bolts or anchors. We will anchor the building directly to the concrete using concrete anchors drilled into the pad. If you decide to pour a concrete ramp, it is very important to drop down 1-1.5″ or 2″ from the top of the pad since the door will also lip down over the concrete by one inch. Call for exact door location.

Wide Variety in Flexibility For Your Financing

Questions? Call Us Today

330-877-8898 (Hartville) 330-239-2200 (Medina). Or Email Dave at dave.kidsworld@gmail.com

Keep Up With Our Blog

How to Clean Outdoor Furniture

How to Clean Outdoor Furniture

Ensuring that your outdoor furniture stays tidy is crucial, for upholding a welcoming area as various materials call for distinct cleaning methods to uphold their durability and lifespan properly. By integrating safety measures and eco-friendly remedies into your...

Is An 8×8 Shed Big Enough

Is An 8×8 Shed Big Enough

Estimated reading time: 6 minutes You may have been thinking to yourself is an 8x8 shed big enough? Choosing the storage shed involves consideration of various factors, like size and customization options available to make the most of it for your needs and preferences...

What Are The Dimensions Of 3 Car Garage

What Are The Dimensions Of 3 Car Garage

Estimated reading time: 6 minutes Having a three-car garage provides room not for parking vehicles but also for utilizing the space as a workshop area or, for additional storage needs, or even as an entertainment zone! Normally speaking. A standard three-car garage...

Get Your Garage Installed Today

330-877-8898 (Hartville) 330-239-2200 (Medina). Or Email Dave at dave.kidsworld@gmail.com