Hartville and Medina, Ohio
Shed Installation & Delivery Options
If you need shed installation, our team of shed installers have many sheds installed for our customers across Ohio and the Midwest.
See them in person
Two Northeast Ohio showrooms in Hartville and Medina.


Delivery and installation
Shed Installation and Delivery Made Simple
Our sheds are delivered on a tilt trailer and if needed, are put in place by mule to ensure exact placement. Delivery is scheduled direct from the factory. Our goal is to work with your schedule and to give you a pleasant experience from start to finish.
Note: On site construction is available to accommodate building sites with limited access.
Delivery and installation
Site Preparation
Please Ensure That Our 'Shed Mule' Can Bring the Shed Fully Assembled Into Your Backyard.
Prepare your site
Shed Installation Methods
Pick the foundation that fits your yard. Our team will walk you through each option before delivery day.

Shed Installation Method 1
Our service continues once you leave the lot. We take care of you by offering site preparation. By choosing gravel for your site shed, you can be sure that your shed will stand the test of time without having to be repositioned every few years.

Shed Installation Method 2
Spread 3″ to 4″ of #57 limestone, 12″ wider than the building size on all four sides. Limestone can be put directly on top of the grass or you may want to remove 3″ to 4″ of sod then replace with your stone. We advise not to put down plastic as it may trap water underneath the building floor. However, you may use a landscaping material that will allow the water through and still prevent weed from growing. This is the best method of site preparation to use if the ground is fairly level.

Shed Installation Method 3
A concrete pad can also be poured. If you plan to eliminate the wood floor and use the concrete as the floor, the pad size needs to be exactly the size of the building and 6″ above ground level (pad must not be oversized). The siding will then lip down over the edge of the concrete by one inch. Do not attach any kind of bolts or anchors. We will anchor the building directly to the concrete using concrete anchors drilled into the pad. If you decide to pour a concrete ramp, it is very important to drop down 1-1.5″ or 2″ from the top of the pad since the door will also lip down over the concrete by one inch. Call for exact door location.
Financing options
Wide Variety in Flexibility For Your Financing
450+
Factory-direct buildings ready now
0%
Interest financing for 30 months
2
Northeast Ohio showrooms
Request a Quote
No pressure and no obligation. Our sales team will reach out to you.
Visit us
Visit Our Hartville and Medina Showrooms
Walk the lot, step inside the buildings and sit in the furniture before you decide. Our sales team is on site to answer questions and help you compare options.
