500 PLUS FACTORY-DIRECT STORAGE SHEDS AND BARNS READY FOR IMMEDIATE DELIVERY 60 MONTHS, 0% INTEREST FINANCING AVAILABLE

Garage Installation and Delivery Made Simple

Our garages are delivered on a tilt trailer and if needed, are put in place by mule to ensure exact placement. Delivery is scheduled direct from the factory. Our goal is to work with your schedule and to give you a pleasant experience from start to finish.

Note: On site construction is available to accommodate building sites with limited access.

SITE PREPARATION

Please ensure that our “garage mule” can bring the garage fully assembled into your backyard.

shed installation services 1

Garage Installation METHOD #1

Our service continues once you leave the lot. We take care of you by offering site preparation. By choosing gravel for your site garage, you can be sure that your garage will stand the test of time without having to be repositioned every few years.

shed installation

Garage Installation Method #2

Spread 3″ to 4″ of #57 limestone, 12″ wider than the building size on all four sides. Limestone can be put directly on top of the grass or you may want to remove 3″ to 4″ of sod then replace with your stone. We advise not to put down plastic as it may trap water underneath the building floor. However, you may use a landscaping material that will allow the water through and still prevent weed from growing. This is the best method of site preparation to use if the ground is fairly level.

shed installation services near me

Garage Installation METHOD #3

A concrete pad can also be poured. If you plan to eliminate the wood floor and use the concrete as the floor, the pad size needs to be exactly the size of the building and 6″ above ground level (pad must not be oversized). The siding will then lip down over the edge of the concrete by one inch. Do not attach any kind of bolts or anchors. We will anchor the building directly to the concrete using concrete anchors drilled into the pad. If you decide to pour a concrete ramp, it is very important to drop down 1-1.5″ or 2″ from the top of the pad since the door will also lip down over the concrete by one inch. Call for exact door location.

Wide Variety in Flexibility For Your Financing

Questions? Call Us Today

330-877-8898 (Hartville) 330-239-2200 (Medina). Or Email Dave at dave.kidsworld@gmail.com

Keep Up With Our Blog

Are Tiny Homes a Good Investment

Are Tiny Homes a Good Investment

Estimated reading time: 8 minutes The trend of house living has been gaining popularity lately as more people seek ways to lessen their environmental impact and venture into property ownership opportunities that are unique and sustainable in nature. However the big...

How Big Should a Chicken Coop Be

How Big Should a Chicken Coop Be

Estimated reading time: 7 minutes Creating your chicken coop requires grasping the ideal size needed to promote your flock's well-being and contentment. The appropriate dimensions for a chicken coop are influenced by aspects such as the quantity of chickens you have,...

How To Frame a Two Story Garage

How To Frame a Two Story Garage

Estimated reading time: 5 minutes Framing a two-story garage, whether it’s a 2-car garage or a larger workshop space, is a significant project that involves careful planning, precise measurements, and the right materials. Knowing how to frame a two story garage right...

Get Your Garage Installed Today

330-877-8898 (Hartville) 330-239-2200 (Medina). Or Email Dave at dave.kidsworld@gmail.com